The project locates in Sujiatun District of Shenyang. The total construction area is about 115000㎡.And the total investment is about 1.13billion yuan. The scale after completion is about 15billion cigarettes/year.
沪ICP备12023716号 2012 © China Haisum Engineering CO., LTD.
沪公网安备 31010402000905号